Project Performance

ENGINEERING ACHIEVEMENTS

Power-related

Foam System Retrofit at the Baobei 500 kV Transformer Substation of Inner Mongolia Electric Power, Baotou Power Supply Bureau, Inner Mongolia
The State Grid’s 800 kV UHV Yikezhao Converter Station project provides fire-fighting equipment.
The converter station of the southern channel in the State Grid Hubei Enshi–Chongqing–Hubei HVDC back-to-back interconnection project is equipped with fire-fighting equipment.
Fire Protection Upgrade and Renovation Project for Phase II of the State Grid Yikezhao 800 kV UHV Converter Station
Jiangsu Zhenjiang Dagang 500 kV Transmission and Transformation Project – Substation Works
Fire-fighting equipment is provided at the Zhalute 800 kV UHV converter station in Inner Mongolia.
Tusi 1100kV Changji Converter Station, Wucainwan Industrial Park, Jimusar County, Changji Prefecture, Xinjiang
Foam spray fire suppression system for the main transformers at substations including the 220 kV Gaolong Substation of State Grid Fujian Electric Power Co., Ltd.
State Grid Xinjiang Electric Power Co., Ltd. provides fire-fighting equipment for the renovation of the 750 kV Yili Substation, the 750 kV Manas Substation, the 750 kV Hami Substation, the 150 kV Aksu Substation, the 750 kV Fenghuang Substation, and the 1750 kV Yyan Substation.
Fire-fighting equipment provided for the renovation of the Turpan 750 kV substation.

State Grid Beijing Electric Power Company provides fire protection equipment for the Hongshan 110 kV substation, the Longchang 110 kV substation, the Laiguangying 110 kV substation, the Liulangzhuang 110 kV substation, the Lugouqiao 10 kV substation, the Lugu 110 kV substation, the Huajiadi 110 kV substation, the Huicheng 110 kV substation, and the Kangbao 500 kV transmission and transformation substation.
State Grid Jiangsu Transmission & Transformation Co., Ltd. provides fire-fighting equipment for the Substation Works of the Suqian Dong 500 kV Transmission and Transformation Project in Jiangsu Province, as well as for the Substation Works of the Zhongwu 500 kV Transmission and Transformation Project in Jiangsu Province—both under the civil engineering scope.
State Grid Xinjiang Electric Power Co., Ltd. provided fire-fighting equipment for the renovation of the Beitashan 750 kV Substation.
State Grid’s 420 kV Chongqing–Hubei DC Interconnection Project
Baiyi Tu 500kV Substation of the Yunnan Power Grid
Longmen Converter Station of the Guangxi UHV Multi-Terminal DC Demonstration Project
Luquan Converter Station
Fuzhou Converter Station
State Grid Gansu Electric Power Company’s Live-Line Work and UAV Maintenance Base for Transmission and Distribution